{"id":990415,"date":"2026-02-07T08:20:29","date_gmt":"2026-02-07T02:50:29","guid":{"rendered":"https:\/\/telecomlive.in\/web\/?p=990415"},"modified":"2026-02-07T08:31:56","modified_gmt":"2026-02-07T03:01:56","slug":"indias-largest-pre-silicon-chip-validation-facility-opens-at-c-dac-bengaluru","status":"publish","type":"post","link":"https:\/\/telecomlive.in\/web\/2026\/02\/07\/indias-largest-pre-silicon-chip-validation-facility-opens-at-c-dac-bengaluru\/","title":{"rendered":"India\u2019s largest pre-silicon chip validation facility opens at C-DAC Bengaluru"},"content":{"rendered":"<p>The Centre for Development of Advanced Computing (C-DAC) on Friday opened a pre-silicon validation facility in Bengaluru that is expected to provide a significant boost to India\u2019s semiconductor design ecosystem. <\/p>\n<p>The facility, PRITVI-ACE, short for Platform for Reconfigurable Integrated Testing and Validation of IPs &#8211; Advanced Chip Evaluation, enables large-scale, near-silicon-speed prototyping and validation of advanced semiconductor designs, a critical requirement as chip complexity continues to rise.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Centre for Development of Advanced Computing (C-DAC) on Friday opened a pre-silicon validation facility in Bengaluru that is expected to provide a significant boost to India\u2019s semiconductor design ecosystem. The facility, PRITVI-ACE, short for Platform for Reconfigurable Integrated Testing and Validation of IPs &#8211; Advanced Chip Evaluation, enables large-scale, near-silicon-speed prototyping and validation of advanced semiconductor designs, a critical requirement as chip complexity continues to rise.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[59,4,10],"tags":[],"class_list":["post-990415","post","type-post","status-publish","format-standard","hentry","category-it-2-the-economic-times","category-newspapers","category-the-economic-times"],"acf":[],"_links":{"self":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/990415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/comments?post=990415"}],"version-history":[{"count":0,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/990415\/revisions"}],"wp:attachment":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/media?parent=990415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/categories?post=990415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/tags?post=990415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}