{"id":800794,"date":"2024-01-11T10:19:01","date_gmt":"2024-01-11T10:19:01","guid":{"rendered":"https:\/\/telecomlive.in\/web\/2024\/01\/11\/ntt-expands-presence-in-india-with-noida-data-center-campus\/"},"modified":"2024-01-11T10:19:01","modified_gmt":"2024-01-11T10:19:01","slug":"ntt-expands-presence-in-india-with-noida-data-center-campus","status":"publish","type":"post","link":"https:\/\/telecomlive.in\/web\/2024\/01\/11\/ntt-expands-presence-in-india-with-noida-data-center-campus\/","title":{"rendered":"NTT expands presence in India with Noida Data Center Campus"},"content":{"rendered":"<p>Global IT infrastructure and services company, NTT Ltd announced the launch of its new data center campus, Noida 2, covering six acres in the Delhi National Capital Region (NCR). The campus is set to accommodate a planned capacity of 52.8 MW critical IT load through two data centers.<\/p>\n<p>The first data center within the campus, delivering today, will support a 22.4 MW IT load across an area of approximately 300,000 sq. ft. (28,000m2). Notably, this marks the first data center campus in India to incorporate seismic dampers, ensuring uninterrupted operations during significant seismic events.<\/p>\n<p>The facility boasts advanced features, including high levels of automation for monitoring and optimizing facility performance, as well as resources like power and water.<\/p>\n<p>Situated in Noida\u2019s data center corridor within the Delhi NCR, the campus is carrier-neutral and interconnected with NTT\u2019s other data center locations. With this launch, NTT\u2019s Global Data Centers division expands its India footprint to over 268 MW with 18 data centers across Delhi NCR, Mumbai, Chennai, and Bengaluru, including the recently live Mumbai 9 data center.<\/p>\n<p>Doug Adams, CEO and President of NTT Global Data Centers &#038; Submarine Cable, stated, \u201cIndia is a priority region in our global strategic roadmap of consistent capacity expansion in existing and new data center markets. With this new site, we reaffirm our commitment to delivering reliable infrastructure supporting our clients\u2019 global digital transformation ambitions.\u201d<\/p>\n<p>Shekhar Sharma, CEO &#038; MD of NTT GDC India &#038; NTT Com India Network Services, added, \u201cThe launch of our new campus in Noida is a significant milestone in our growth journey in India. Clients will now access our trusted data center services from an interconnected campus in North India, supporting the country&#8217;s accelerating digital economy.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Global IT infrastructure and services company, NTT Ltd announced the launch of its new data center campus, Noida 2, covering six acres in the Delhi National Capital Region (NCR). The campus is set to accommodate a planned capacity of 52.8 MW critical IT load through two data centers. The first data center within the campus, delivering today, will support a 22.4 MW IT load across an area of approximately 300,000 sq. ft. (28,000m2). Notably, this marks the first data center campus in India to incorporate seismic dampers, ensuring uninterrupted operations during significant seismic events. The facility boasts advanced features, including [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-800794","post","type-post","status-publish","format-standard","hentry","category-it-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/800794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/comments?post=800794"}],"version-history":[{"count":0,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/800794\/revisions"}],"wp:attachment":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/media?parent=800794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/categories?post=800794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/tags?post=800794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}