{"id":1040409,"date":"2026-10-02T18:06:21","date_gmt":"2026-10-02T12:36:21","guid":{"rendered":"https:\/\/telecomlive.in\/web\/?p=1040409"},"modified":"2026-10-02T18:17:13","modified_gmt":"2026-10-02T12:47:13","slug":"data-centre","status":"publish","type":"post","link":"https:\/\/telecomlive.in\/web\/2026\/10\/02\/data-centre\/","title":{"rendered":"Data Centre"},"content":{"rendered":"<p>Andhra Pradesh has cleared four large data-centre and AI-infrastructure projects across Vizianagaram, Anakapalli and Visakhapatnam districts, with a combined proposed investment of more than Rs 2.83 lakh crore \u2014 one of the larger data-centre pipelines assembled by any Indian state so far. The projects range from a 486 MW facility to a 1,000 MW plant and a 512 MW green integrated AI data centre and collectively point to nearly 2,000 MW of capacity, though the capacity of the largest of the four, Reliance Industries&#8217; Vizianagaram project, has not been specified in the government order. <\/p>\n<p>In this process, large incentives have been offered, including SGST waivers, cheap land, concessional electricity, and the creation of massive transmission infrastructure for a sector that consumes significant power. While states provide these incentives primarily to drive local job creation, data centers actually operate with a skeleton crew due to high levels of automation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Andhra Pradesh has cleared four large data-centre and AI-infrastructure projects across Vizianagaram, Anakapalli and Visakhapatnam districts, with a combined proposed investment of more than Rs 2.83 lakh crore \u2014 one of the larger data-centre pipelines assembled by any Indian state so far. The projects range from a 486 MW facility to a 1,000 MW plant and a 512 MW green integrated AI data centre and collectively point to nearly 2,000 MW of capacity, though the capacity of the largest of the four, Reliance Industries&#8217; Vizianagaram project, has not been specified in the government order. In this process, large incentives have [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1040418,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-1040409","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-magazinenews"],"acf":[],"_links":{"self":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/1040409","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/comments?post=1040409"}],"version-history":[{"count":1,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/1040409\/revisions"}],"predecessor-version":[{"id":1040419,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/posts\/1040409\/revisions\/1040419"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/media\/1040418"}],"wp:attachment":[{"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/media?parent=1040409"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/categories?post=1040409"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/telecomlive.in\/web\/wp-json\/wp\/v2\/tags?post=1040409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}