Belgium mulls energy limits for power-hungry data centres as AI demand surges
By
Neha Kumari
Oct 22 (Reuters) – Belgium’s grid operator could set an electricity allocation limit on data centres to prevent other industrial users from being squeezed out, it said, following a surge in demand from the energy-intensive facilities that power AI.
Under reforms proposed by the operator Elia, data centres would be placed in a separate category that would allow grid capacity to be allocated specifically for them within a set limit, the company told Reuters.
